Which configuration file contains the environment settings to enable Federal Information Processing Standards
Which configuration file contains the environment settings to enable Federal Information Processing
Standards compliance?
What are two valid methods for creating or editing an extended agent’s options file?
What are two valid methods for creating or editing an extended agent’s options file? (Choose two.)
what the current plan would be if it covered a longer period of time?
Which plan type is a projection of what the current plan would be if it covered a longer period of
time?
What are two prerequisites to install an IBM Tivoli Workload Scheduler V8.6 (TWS) fault-tolerant or dynamic ag
What are two prerequisites to install an IBM Tivoli Workload Scheduler V8.6 (TWS) fault-tolerant or
dynamic agent on a Windows system?
Which process must be active for scheduled jobs to launch?
Which process must be active for scheduled jobs to launch?
Which command shows the current fix pack on all agents in the IBM Tivoli Workload Scheduler V8.6 network?
Which command shows the current fix pack on all agents in the IBM Tivoli Workload Scheduler V8.6
network?
where is <TWS_Home> located?
An IBM Tivoli Workload Scheduler (TWS) V8.5 fault-tolerant agent running on UNIX/Linux has been
installed using the installation wizard with <TWS_Home> under the default location. After a direct
upgrade to TWS V8.6 using the installation wizard, where is <TWS_Home> located?
Which two scenarios can cause message files to become corrupt in IBM Tivoli Workload Scheduler V8.6 (TWS)?
Which two scenarios can cause message files to become corrupt in IBM Tivoli Workload Scheduler
V8.6 (TWS)? (Choose two.)
What will allow jobs to start?
A user runs Reset Plan -scratch on a master domain manager (MDM). runs JnextPian, and then
immediately submits a predefined job stream with jobs on the MDM. No jobs in the job stream start
on the MDM. What will allow jobs to start?
which command should be used?
The planman command’s -to option expects the date in the format mm/dd/yy[yy]. In order to
calculate the next work day’s date in a script, which command should be used?