which activity must be performed to resume operations?
A customer has a TS3500 Tape Library with TS1140 Tape Drives, but does not have the High Availability’
feature.
If the accessory fails, which activity must be performed to resume operations?
what is the minimum number of Model 007 controllers required to install the maximum number of drives supported
In a single TS3500 library’ with no other TS7700 oropen systems drives, what is the minimum number of
Model 007 controllers required to install the maximum number of drives supported in the TS3500 library?
What is the likely cause of this issue?
The customer operations personnel complains that the list of volumes for off-site vaulting includes logical
volumes resident in the TS7740 subsystem.
What is the likely cause of this issue?
What is the key advantage of the IBM TS7720 over the EMO DLm?
What is the key advantage of the IBM TS7720 over the EMO DLm?
which frame can be configured as a service bay on the right side of the TS3500 High Availability Tape Library?
As viewed from the front of the library, which frame can be configured as a service bay on the right side of the
TS3500 High Availability Tape Library?
Which activity is a customer responsibility during setup of a TS7700 Virtualization Engine?
Which activity is a customer responsibility during setup of a TS7700 Virtualization Engine?
which of the following is one step that must be taken?
In a TS7740 two-way grid Cluster 0 is the production site and Cluster I is the remote DR site. The scratch
volume category for the production site is 0012 andDR site’s scratch volume category is 0022. Before a DR
test is started, several DR system updates must be in place to protect the production scratch volumes from
being allocated during the test.
Assuming Selective Write Protect is enabled, which of the following is one step that must be taken?
What is a possible effect on the customer’s tape workload?
A customer is in the process of installing a two node TS7740 grid with a single production site. The second site
used for DR is 50 km away. They want to set all logical volumes to have a size of 6 GB. What is a possible
effect on the customer’s tape workload?
What should be the next step to try to resolve the issue via IBM?
A newly installed TS7720 Virtualization Engine has recently been integrated into a three-way grid. Thelogical
volumes created in the other two systems are not properly being replicated to the new system. All local IBM
and customer support resources have been exhausted in trying to determine the cause with no resolutionin
sight.
What should be the next step to try to resolve the issue via IBM?
What indicates that the physical installation of a TS7720 Virtualization Engine is complete and available to t
What indicates that the physical installation of a TS7720 Virtualization Engine is complete and available to the
customer?