(Choose two.)
The parallel framework was extended for real-time applications. Identify two of these aspects.
(Choose two.)
How must the input data set be organized for input into the Join stage?
How must the input data set be organized for input into the Join stage? (Choose two.)
What are two change values identified by these code values?
The Change Apply stage produces a change Data Set with a new column representing the code
for the type of change. What are two change values identified by these code values? (Choose
two.)
What stage allows for more than one reject link?
What stage allows for more than one reject link?
which two changes could improve sort performance in this scenario?
A 100MB input dataset has even distribution across 400 unique key values. When you run with a
4-node configuration file, which two changes could improve sort performance in this scenario?
(Choose two.)
Which statement is correct about the Data Rules stage?
Which statement is correct about the Data Rules stage?
Which job design technique can be used to give unique names to sequential output files that are used in multi
Which job design technique can be used to give unique names to sequential output files that are
used in multi-instance jobs?
which two SQL Server data types?
The ODBC stage can handle which two SQL Server data types? (Choose two.)
Which DB2 to InfoSphere DataStage data type conversion is correct when reading data with the DB2 Connector sta
Which DB2 to InfoSphere DataStage data type conversion is correct when reading data with the
DB2 Connector stage?
Which Oracle data type conversion is correct?
Which Oracle data type conversion is correct?