PrepAway - Latest Free Exam Questions & Answers

Category: 000-109

Exam 000-109: Virtualization Technical Support for AIX and Linux – v2

How can the duplicate systems be updated to enable these additional features?

A secondary site is being deployed for application availability and site failover. Servers of identical
model and type have been ordered and delivered to the new location.
Additional PowerVM activation keys were obtained for the original location to allow more than
32000 WWNs and enable Active Memory Sharing (AMS).
How can the duplicate systems be updated to enable these additional features?

What needs to be considered to preserve the ability to restore an existing LPAR on the new infrastructure?

A number of POWER7 servers have been ordered to replace an existing infrastructure of
POWER4 machines. All existing LPARs will be manually recreated on the new machines,
preserving the installed operating systems.
An administrator is planning to attach the POWER7 machines to the subnet, allowing the LPARs
to keep their hostname and IP addresses. The NIM server that will be used to restore the LPARs
on the new machines allows its clients it initiate NIM client commands.
What needs to be considered to preserve the ability to restore an existing LPAR on the new
infrastructure?

What action would allow the two partitions to run efficiently at the same time?

A system with two WPARs is reaching the memory limits imposed on them. Both have been set to
a hard limit of 50%.

WPAR1 has a peak from 8am-10am of 70% memory resources
WPAR2 has a peak from 2pm-6pm of 65% memory resources
At peak times the system may kill processes which request more memory, as paging space is
exhausted.
What action would allow the two partitions to run efficiently at the same time?

what is the maximum number of processors which can be allocated to LPAR1?

A customer is consolidating two POWER6 595 servers to a single Power 795. The two 595
servers each have 24 active processors and have the following LPARs using dedicated
processors, running continuously:

The new Power 795 system will have two Processor Books (nodes), each with 8 cores activated in
all MCMs (Multi Chip Modules).
LPAR1 is in need of more processing power. If all the other LPARs keep their existing Processor
allocation, what is the maximum number of processors which can be allocated to LPAR1?


Page 9 of 18« First...7891011...Last »