PrepAway - Latest Free Exam Questions & Answers

Category: C2090-424

Briefing C2090-424: InfoSphere DataStage v11.3

what does the optimized job design look like?

Your job consists of a DB2 Connector stage followed by a Sort stage followed by a Transformer stage followed
by another DB2 Connector stage.
The following two Balanced Optimizer options have been selected:
– Push processing to data sources
– Push processing to data targets
The following two Balanced Optimizer options have NOT been selected:
– Push data reduction processing to data targets
– Push all processing into the(target)data server
Assuming the job design allows for maximum optimization, what does the optimized job design look like?


Page 4 of 7« First...23456...Last »