What is a reason for using the ODBC reporting options?
What is a reason for using the ODBC reporting options?
Which two components of Business Intelligence Reporting Tool have been incorporated into the IBM Maximo Asset
Which two components of Business Intelligence Reporting Tool have been incorporated into the IBM Maximo Asset Management solution? (Choose two.)
Which three Business Intelligence Reporting Tool report formats are supported out-of-the-box with IBM Maximo A
Which three Business Intelligence Reporting Tool report formats are supported out-of-the-box with IBM Maximo Asset Management? (Choose three.)
33 IBM 000-001: Practice Exam
While setting up reports, which three attributes can be specified? (Choose three.)
While setting up reports, which three attributes can be specified? (Choose three.)
Which two suggestions should be provided to the client on how these tools can be set up in IMAM? (Choose Two.)
A power company is interested in implementing IBM Maximo Asset Management (IMAM) at power plants at different locations in UK. Some of the tools used during maintenance, such as submersible pumps for dewatering of water intake channels in order to carry out maintenance on the circulating water pumps, are very expensive. A key business requirement is to monitor the usage and costs of these pumps, and at the same time to ensure that these tools are in perfect condition when required.
Which two suggestions should be provided to the client on how these tools can be set up in IMAM? (Choose Two.)
Which information is provided in this report?
A key report produced by IBM Maximo Asset Management is the Work Order Detail report. Which information is provided in this report?
Which four reporting options are available in IBM Maximo Asset Management?
Which four reporting options are available in IBM Maximo Asset Management?
Which reporting engine is packaged with Maximo V6 EAM (EAM V6), and which engine is packaged with IBM Maximo A
Which reporting engine is packaged with Maximo V6 EAM (EAM V6), and which engine is packaged with IBM Maximo Asset Management V7.1 (IMAM) ?
What are three applications included in the Inventory Module? (Choose three.)
What are three applications included in the Inventory Module? (Choose three.)
What are two conditions that the PO line item must meet in order to distribute its costs? (Choose two.)
The cost of a purchase order ( PO) line item can be distributed among several GL accounts. The Distribute Costs dialog box is accessible from the PO Lines tab. What are two conditions that the PO line item must meet in order to distribute its costs? (Choose two.)