Click on the exhibit below.
Assume the port on CE-A is sending two tags, a top tag of 100 and a bottom tag of 500. PE-A is configured with a SAP id of 1/1/1:100.*. How should PE-B be configured if CE-B is expecting a top tag of 200 and a bottom tag of 500?
A. PE-B will require a SAP id of “sap 1/1/1:500*”.
B. PE-B will require a SAP id of “sap 1/1/1:100*”.
C. PE-B will require a SAP id of “sap 1/1/1:500.200”.
D. PE-B will require a SAP id of “sap 1/1/1:200*”.