Which two [2] events can cause this problem?

PowerPath was successfully installed two weeks ago on a Solaris 2.8 host. The host is now reporting stack
overflow messages. Which two [2] events can cause this problem?

A.
Installation of Veritas Volume manager changed stack size to 0X4000

B.
Customer manually reduced stack size in /etc/system file to 0X4000

C.
Customer deleted stack size entry in powerpath custom file on the server

D.
Customer manually added too many 0X400 stack sizeentries to /etc/system