Refer to the exhibit. An SRDF/Star configuration has production running at Site A. A
symstar halt command is executed at the workload site (Site A). Which action would
reconfigure the RDF device relationships such that the workload site is located at Site B and
both RDF targets are in the disconnected state?

A.
A reconfigure action
B.
A switch action
C.
A connect action
D.
An enable action