After acquiring a company 300 hundred miles from their current office the customer has asked EMC to help to
design a single hop application recovery plan aftercareful analysis of the work load and available bandwidth,
SRDF/AR was selected as the solution.
If the SRDF/AR cycle time is set to 90 minutes, what is the maximum potential data loss?

A.
2 hours of data
B.
1.5 hours of data
C.
4.5 hours of data
D.
3 hours of data
Answer should be D. 3 hours of data
0
0