You are designing a LUN layout for Certkiller .com who plans on using Replication Manager/SE for its Exchange 2003 environment. They have three database LUNs and two Log LUNs that you must include in your activity. You want to make certain that each LUN synchronizes with a specific target Clone when the first job runs. What do you do?

A.
Add the production LUNs and target Clone LUNs in the same order when configuring the LUN pool.
B.
Pre-associate the source and target LUNs using the native management tools such as Navisphere or ControlCenter
C.
Configure a separate LUN pool for each production volume. Put the intended Clone volume into each pool.
D.
Ensure that each production LUN has a unique size. Make the intended Clone LUNs exactly match the size of the production LUNs.