Your customer has three fabric islands. One fabric island has three ED-1032s. Two other fabric
islands have two DS16B2s in each. The customer wants to migrate to two fabrics built of two MDS
9509s in each fabric. Several SUN Solaris servers must be migrated on-line to the new fabrics.
What are two [2] steps required to perform this migration?

A.
Reactivate the disabled path on the new fabric with PowerPath commands and set the speed to
1GB
B.
Disable one path to the fabric
C.
Apply the zoning to the new switch
D.
Reactivate the disabled path on the new fabric with PowerPath commands and set the speed to
2GB
Your customer has three fabric islands. One fabric island has three ED-1032s. Two other fabric
islands have two DS16B2s in each. The customer
wants to migrate to two fabrics built of two MDS 9509s in each fabric. Several SUN Solaris servers
must be migrated on-line to the new fabrics.