The four AC power feeds to the DMX2000 and DMX3000 cabinets are NOT installed correctly at the customer site. In this case, what would happen if power to PLIM A is lost?

A.
AUX power would be invoked
B.
Data vaulted
C.
PLIM B would be invoked
D.
Data Unavailable