You are preparing a site for a large Metro VPLEX cluster. The storage administrator wants to
prepare the storage network configuration and needs to ensure easy troubleshooting of storage
path faults.
How many WAN-COM zones will need to be created?
A.
24
B.
16
C.
8
D.
32
Explanation: