PrepAway - Latest Free Exam Questions & Answers

How could this have been prevented?

Your customer has recently purchased a second site and is now in the process of connecting the
second site to the existing environment. Customer is using DS16B2, DS32B2 and ED-24000B
switches and directors. Sever problems, such as unstable and unmanageable fabric, occurred
after connecting the two sites with an MPR 7420. How could this have been prevented?

PrepAway - Latest Free Exam Questions & Answers

A.
Set Management Server on the multi-protocol router to disable

B.
Set fabric parameters WAN_TOV and ED_TOV

C.
Set all member switches PID format set to 0

D.
Set all member switches WAN_BB to 256


Leave a Reply