Your customer has recently purchased a second site and is now in the process of connecting the
second site to the existing environment. Customer is using DS16B2, DS32B2 and ED-24000B
switches and directors. Sever problems, such as unstable and unmanageable fabric, occurred
after connecting the two sites with an MPR 7420. How could this have been prevented?

A.
Set Management Server on the multi-protocol router to disable
B.
Set fabric parameters WAN_TOV and ED_TOV
C.
Set all member switches PID format set to 0
D.
Set all member switches WAN_BB to 256