Explain what the requirements are for connecting an NS600G/GS to be Direct Connected to an existing CX600.

A.
Four [4] free Fiber Switch ports, 5 unbound disk drives, PowerPath
B.
Two [2] free ports per SP 5 unbound disk drive, Assess Lo0gix
C.
Two [2] free ports per SP, 8+1 Raid 5 Group with 6 LUNs, Acess Logix
D.
Two [2] free ports per SP 5 unbound disk drive, PowerPath