PrepAway - Latest Free Exam Questions & Answers

Category: E20-555 (v.1)

Exam E20-555: Isilon Solutions and Design Specialist Exam for Technology Architects (update January 28th, 2014)

what are the customer’s capacity requirements?

— Exhibit —
A European Sports TV network is considering Isilon for their Media Edit Storage for their editing
workloads. They are also considering Isilon for near-line media archiving.
The network receives XDCAM HD footage which is loaded onto their existing Transcoding Storage
platform. New footage that needs to be edited will be transferred from their Transcoding Storage
platform to the proposed Media Edit Storage platform at the rate of ten simultaneous XDCAM HD
files via FTP. Edited files will be transferred back to the Transcoding Storage platform at the rate
of ten simultaneous XDCAM HD files via FTP.
The network currently has 15 Final Cut Pro edit stations, 15 Avid edit stations. Proxy software will
be used to allow Isilon to act as the storage for the Final Cut Pro and Avid media. Three of those
edit stations will be performing content compositing as needed.
The network expects 70 hours of new content per week, and 50 hours of edited content per week.
They intend to keep the new and edited content on the proposed Media Edit Storage as a
performance tier for 30 days. They would like to retain all new and edited footage proposed Media
Edit Storage as a near-line tier for two years.

In addition to the current workloads, the network expects to implement a new Media Asset
Management (MAM) solution and has requested the Isilon cluster be capable of supporting 120
MBps read and 120 MBps write to support the MAM requirements.

— Exhibit —
Refer to the exhibit.

Based on the described use of the cluster, what are the customer’s capacity requirements?

which node combination is the appropriate choice for the customer’s requirements?

— Exhibit —
A European Sports TV network is considering Isilon for their Media Edit Storage for their editing
workloads. They are also considering Isilon for near-line media archiving.
The network receives XDCAM HD footage which is loaded onto their existing Transcoding Storage
platform. New footage that needs to be edited will be transferred from their Transcoding Storage
platform to the proposed Media Edit Storage platform at the rate of ten simultaneous XDCAM HD
files via FTP. Edited files will be transferred back to the Transcoding Storage platform at the rate
of ten simultaneous XDCAM HD files via FTP.
The network currently has 15 Final Cut Pro edit stations, 15 Avid edit stations. Proxy software will
be used to allow Isilon to act as the storage for the Final Cut Pro and Avid media. Three of those
edit stations will be performing content compositing as needed.
The network expects 70 hours of new content per week, and 50 hours of edited content per week.
They intend to keep the new and edited content on the proposed Media Edit Storage as a
performance tier for 30 days. They would like to retain all new and edited footage proposed Media
Edit Storage as a near-line tier for two years.
In addition to the current workloads, the network expects to implement a new Media Asset
Management (MAM) solution and has requested the Isilon cluster be capable of supporting 120
MBps read and 120 MBps write to support the MAM requirements.

— Exhibit —
Refer to the exhibit.

Based on the described use of the cluster, which node combination is the appropriate choice for
the customer’s requirements?

Which Isilon configuration should be recommended?

A customer plans to consolidate 200 TB of digital images and video content. Performance is

important for recently created files. However, the customer wants any content that has not been
accessed within 30 days to be stored in the cluster at a much lower cost because performance is
no longer critical.Which Isilon configuration should be recommended?

What information can be provided to the customer about the protection level for the target directory?

A customer has an SMB file directory with 375 TB of data on the primary cluster with a protection
level of N+ 3:1. They want to replicate this directory to the secondary cluster. The customer would
like information about the possibility of setting protection levels on the target cluster.
What information can be provided to the customer about the protection level for the target
directory?


Page 16 of 23« First...10...1415161718...Last »