PrepAway - Latest Free Exam Questions & Answers

Category: E20-329 (v.3)

Exam E20-329: Technology Architect Backup and Recovery Solutions Design Exam (update November 17th, 2016)

Which recomme4ndation satisfies the customer’s requirements?

A customer has acquired multiple companies with a combination of IBM Tivoli Storage
Manager, EMC NetWorker, and IBM iSeries BRMS backups to physical tape in their data
center. They have a data carter 15 miles away that plan to use for disaster recovery. Dark
fiber between the two sites exists. The customer has asked EMC to help improve their
backup performance and reliability. They also want to eliminate the need to move physical
tapes offsite each day. Which recomme4ndation satisfies the customer’s requirements?

What should be changed in the design and implementation of this solution?

An Avamar customer is using replication between two data centers. There is a T1 line
between the data centers and it is dedicated to Avamar replication. The customer is
concerned that Avamar replication is only getting throughput of 1.1 megabits per second
during replication. What should be changed in the design and implementation of this
solution?

Which EDL relocation option meets the customer’s requirements?

A Symantec Backup Exec customer purchased an EMC Disk Library (EDL) last year and
performs 1.5 TB of nightly backups. Backup Exec is used to copy EDL virtual tapes to

physical tapes to satisfy offsite requirements. The daily backup and tape copying workload
is becoming a challenge for their Backup Exec server. The customer is exploring
EDL-to-EDL replication to a second a second site seven miles always to eliminate physical
tape and reduce the Backup Exec server workload. Which EDL relocation option meets the
customer’s requirements?

What is the minimum number of Avamar 2 TB data nodes that should be ordered to perform a recovery of all six f

A data center consisting of six Microsoft Windows file servers must be backed up. Each file
server contains 750,000 files and approximately 150 GB of data. The file servers have been
tested simultaneously. Each file server can read data from the network and write it to disk at
the rate of 75 GB per hour. The data center has a 10 Gigabit Ethernet backbone. What is
the minimum number of Avamar 2 TB data nodes that should be ordered to perform a
recovery of all six file servers and achieve a recovery time objective of 8 hours?

What is a recommended backup solution?

The EMC account team has been asked to design a Network backup solution for a VMware
ESX3.5 environment with the following requirements: 1. Reduce workload on the ESX
server during backups 2. Eliminate backup traffic from the LAN by moving data directly from
the SAN 3. Support file-level backups for virtual machines running Microsoft Windows What
is a recommended backup solution?

what is the total number of front-end ports from both engines that need to be connected to the SAN?

A customer is considering implementing an EMC Disk Library with Active Engine Failover
(AEF). Front-end ports 1, 3, and 4 from Engine A will be connected to the SAN. On Engine
B, front-end ports 7, 8, and 11 will be connected to the SAN. To ensure proper AEF
functionality, what is the total number of front-end ports from both engines that need to be
connected to the SAN?

Which backup deployment would you suggest that has the least disruptive hardware impact to the customer’s cu

A customer has a current EMC NetWorker LAN backup environment. The environment is
using a local EMC Disk Library (EDL) with replication to a remote disaster recovery site.
They want to introduce a four Data Mover Celerra into their environment for consolidated
Windows user collaborative data on CIFS shares. Which backup deployment would you
suggest that has the least disruptive hardware impact to the customer’s current backup
procedure?

What needs to be considered with regards to DPA licensing?

You are proposing Data Protection Advisor (DPA) to provide a single reporting interface in a
multivendor backup environment. The environment consists of IBM Tivoli Storage Manager
(TSM), Symantec Net Backup, NetWorker, and Avamar. Each application manages 200
clients. What needs to be considered with regards to DPA licensing?

What is the most likely cause of their increased latency after the reconfiguration?

An existing EMC NetWorker customer has recently undertaken an LDAP authentication
network infrastructure reconfiguration to ensure an improved validation response time. The
reconfiguration does not involve the addition of any physical network hardware to the
infrastructure. However, they have now approached you to assist with an increased latency
they are experiencing on their network. What is the most likely cause of their increased
latency after the reconfiguration?


Page 6 of 31« First...45678...2030...Last »