PrepAway - Latest Free Exam Questions & Answers

Category: E20-324 (v.2)

Exam E20-324: VNX Solutions Design Exam for Technology Architects (update Octobe 24th, 2014)

How much data is moved across the link in the 20- minute period?

Your customer plans to use Incremental SAN Copy as part of a DR solution. The Source LUN is
256 GiB in size, and a clone of this LUN will be used as the ISC source LUN. The host accessing
the LUN generates 500 4 KiB IOPS with a R/W ratio of 9:1. The clone is fractured every 20
minutes, and an ISC update is performed. How much data is moved across the link in the 20-
minute period?

How much data will be copied to the secondary as part of the resynchronization process?

A customer has a 512 GiB primary MirrorView/S image. The image workload is 1,000 IOPs of
random 4 KiB IOs, with a R/W ratio of 3:1. The secondary image is fractured for 30 seconds as the
result of a connectivity failure. How much data will be copied to the secondary as part of the
resynchronization process?

How much data will be copied to the secondary as part of the resynchronization process?

A customer has a 256 GiB primary MirrorView/S image. The image workload is 1,000 IOPs of
random 8 KiB I/Os, with a R/W ratio of 3:1. The secondary image is fractured for 20 seconds as
the result of a connectivity failure. How much data will be copied to the secondary as part of the
resynchronization process?

How much bandwidth is required to meet customer requirements?

Click on the calculator icon in the upper left-hand corner. A customer has a 2 TiB LUN which will
be mirrored with MirrorView/S. Analyzer shows the current workload to be 500 8 KiB IOPs with a
R/W ratio of 3:1. The customer requires that the mirror should resynchronize within 2 hours if
fractured for 10 minutes or less. How much bandwidth is required to meet customer requirements?

How much bandwidth is required to meet customer requirements?

Click on the calculator icon in the upper left-hand corner. A customer has a 1 TiB LUN which will
be mirrored with MirrorView/S. Analyzer shows the current workload to be 600 8 KiB IOPs with a
R/W ratio of 2:1. The customer requires that the mirror should resynchronize within 90 minutes if
fractured for 15 minutes or less. How much bandwidth is required to meet customer requirements?

what is the maximum bandwidth required for the link between the VNX systems?

Click on the calculator icon in the upper left-hand corner. Your customer wants to use a VNX
system at an unmanned DR site. The system will be used exclusively as a secondary
MirrorView/A system, and it is capable of performing 30,000 LUN IOPs in this role. The primary
system is also a VNX.
If the primary image workload consists of 4 KiB random IOs with a R/W ratio of 3:1, what is the
maximum bandwidth required for the link between the VNX systems?

what is the maximum bandwidth required for the link between the VNX systems?

Click on the calculator icon in the upper left-hand corner. Your customer wants to use a VNX
system at an unmanned DR site. The system will be used exclusively as a secondary
MirrorView/A system, and it is capable of performing 60,000 LUN IOPs in this role. The primary
system is also a VNX.
If the total primary image workload consists of 1 KiB random I/Os with a R/W ratio of 3:1, what is
the maximum bandwidth required for the link between the VNX systems?


Page 9 of 23« First...7891011...20...Last »