how many days does the customer have until the Avamar grid is full?
A customer is viewing the EMC Avamar dashboard. They observe that the Server Capacity
Forecast icon is “red”. If the rate of consumption stays at the current rate, how many days
does the customer have until the Avamar grid is full?
what is the minimum number of backup jobs needed to back up the entire volume?
An EMC Avamar administrator has an EMC Celerra volume with 25 million files backing up
with a single Avamar NDMP Accelerator node. Based on EMC best practices, what is the
minimum number of backup jobs needed to back up the entire volume?
Which ports are used for communications between ‘avagent’ on the client and the EMC Avamar utility
Which ports are used for communications between ‘avagent’ on the client and the EMC
Avamar utility node?
What is used in an EMC Avamar client to identify data that has not been previously stored on the Avamar server
What is used in an EMC Avamar client to identify data that has not been previously stored
on the Avamar server?
what is the minimum number of nodes for a Avamar Gen4 Data Store for a multi-node server?
If an EMC Avamar customer does not have premium hardware support, what is the
minimum number of nodes for a Avamar Gen4 Data Store for a multi-node server?
which types of clients are supported for backing up to a Data Domain device?
When integrating EMC Avamar and EMC Data Domain, which types of clients are
supported for backing up to a Data Domain device?
Which backup approach should they use?
A customer wants to use EMC Avamar to back up their VMware environment. They have a
requirement for file-level restores of their Linux virtual machines. Which backup approach
should they use?
Which EMC Avamar backup process breaks data into variable sized chunks?
Which EMC Avamar backup process breaks data into variable sized chunks?
how often does the EMC Avamar HFS check process run?
By default, how often does the EMC Avamar HFS check process run?
Which process must wait until the HFS check is complete?
HFS check has started on a customer’s EMC Avamar grid. Which process must wait until
the HFS check is complete?