what can done?
What is a recommendation for testing the throughput rate and recovery?
A customer’s database administrators need to know that they can meet their RTO. In addition,
they want to know how to test the throughput rate when recovering all data and how to format the
recovery command to guarantee throughput.
What is a recommendation for testing the throughput rate and recovery?
What must be done at the disaster recovery site to support replication from the HQ Avamar/DD system?
The customer has decided to add a second Data Domain server to HQ to meet database backup
growth for Microsoft SharePoint which consists of many small databases. The customer advises
you that HQ now has two Data Domain (DD)servers paired to the single Avamar Gen4 server.
The disaster site has an integrated Avamar server with an expandable Data Domain server.
However, the Avamar server is a single-node Gen4 that cannot be further expanded and is at
capacity.
What must be done at the disaster recovery site to support replication from the HQ Avamar/DD
system?
What can be done to minimize the backup load on the clients with minimal resources?
Refer to Scenario 4.
What can be done to minimize the backup load on the clients with minimal resources?
What is the maximum number of recovery sessions that can run concurrently to a single client?
Refer to Scenario 4.
What is the maximum number of recovery sessions that can run concurrently to a single client?
Which user account is used to write to the GSAN?
Which backup method would provide the lowest RTO?
How large can the hash file grow?
Where do the Microsoft Exchange VSS plug-ins need to be installed?
Refer to Scenario 7.
Where do the Microsoft Exchange VSS plug-ins need to be installed?