EMC Exam Questions

After connecting the SPSs, which ports on the DPE would the engineer use to install the first DAE an

An engineer is installing a VNX Block system with two SPSs, a DPE, and two optional DAEs. After connecting the SPSs, which ports on the DPE would the engineer use to install the first DAE and the second DAE?

A.
SAS port 1 from the DPE to the first DAE.
SAS port 0 from the DPE to the second DAE.

B.
SAS port 0 from the DPE to the first DAE.
SAS port 1 from the DPE to the second DAE.

C.
SAS port 1 from the DPE to the first DAE.
SAS port 0 from I/O module 1 on the DPE to the second DAE.

D.
SAS port 0 from the DPE to the first DAE.
SAS port 0 from I/O module 1 on the DPE to the second DAE.