PrepAway - Latest Free Exam Questions & Answers

Category: SK0-002 (v.1)

Exam SK0-002: Server+ (update April 10th, 2014)

Which factor was not included in the pre-installation planning?

After a pre-installation walkthrough, the server technician concludes that the power outlets, rack
dimensions, physical security, and network cabling are all acceptable. However, one factor is
missing in the pre-installation planning, so the technician decides not to install the server in this
location.
Which factor was not included in the pre-installation planning?


Page 12 of 21« First...1011121314...20...Last »