PrepAway - Latest Free Exam Questions & Answers

Category: SG0-001 (v.3)

Exam SG0-001: CompTIA Storage+ Powered by SNIA (update May 20th, 2015)

which of the following ways should the power supplies be attached to the rack power busses?

Two Fibre Channel directors are being installed in a rack. The rack has two power buses, each
attached to a separate Power Distribution Unit (PDU). The directors have dual power supplies to
supply N+1 power to the directors. In which of the following ways should the power supplies be
attached to the rack power busses?

Which of the following can the system administrator do NEXT to resolve the issue, after verifying correct netw

A server needs to be connected to a new SAN via iSCSI, but the system administrator is unable to
see any of the LUNs from the server. Which of the following can the system administrator do
NEXT to resolve the issue, after verifying correct network configuration and basic network
connectivity?


Page 13 of 54« First...1112131415...203040...Last »