Which of the following RAID configurations should the a…
A server administrator is implementing disk redundancy in all database servers. Which of the following RAID
configurations should the administrator use so that a MINIMUM number of disks are required?
Which of the following describes how the NICs should be…
A server technician is replacing a web server in an organization. The new server has two integrated NICs.
Which of the following describes how the NICs should be configured for fault protection?
Which of the following hardware considerations would be…
A technician is asked to install an additional NIC in a server. Which of the following hardware considerations
would be BEST for the technician to make?
Which of the following is the MAXIMUM number of half-he…
A blade chassis can hold 16 half-height blades or eight full-height blades. Which of the following is the
MAXIMUM number of half-height blades that can be installed in the chassis if six full-height blades are already
installed?
Which of the following is a benefit of a technician con…
A blade server chassis has two power supplies. Which of the following is a benefit of a technician connecting
each power supply to a separate UPS unit?
Which of the following is the height of 1U of space in …
Which of the following is the height of 1U of space in a server rack?
Which of the following is the FIRST step the project take?
A carpenter on a project team reports there is insufficient time to accomplish tasks on schedule.
Which of the following is the FIRST step the project take?
Which of the following are characteristics of a project?
Which of the following are characteristics of a project? (Select TWO.)
which of the following phases is the project?
A project manager is creating the WBS. In which of the following phases is the project?
Which of the following should the project manger do NEXT?
A project manger received a change request, immediately documented the required changes, and
evaluated the impact of and justification for the changes. Which of the following should the project
manger do NEXT?