Which three configuration steps are needed for this deployment?

A customer wants to deploy single-hop FCoE in the data center using Cisco Nexus 5500 switches.
Which three configuration steps are needed for this deployment? (Choose three.)

PrepAway - Latest Free Exam Questions & Answers

A.
Enable the FCoE feature on the Cisco Nexus 5500.

B.
Configure FCoE VSAN to VLAN mapping.

C.
Configure the virtual Fibre Channel interface.

D.
Configure FCoE-NPV mode on the Cisco Nexus 5500.

E.
Configure the storage VDC for FCoE.

F.
Enable NPV on the Cisco Nexus 5500.