which power setting should be used for a site survey? seenagape 12 years ago Given an AP that can transmit at 100 mW and the client at 40 mW, which power setting should be used for asite survey? A.10 mW B.20 mW C.40 mW D.60 mW E.80 mW F.100 mW ← Previous question Next question →