Drag the design requirements on the left to the appropriate tool and protocols on the right. seenagape 10 years ago DRAG DROPDrag the design requirements on the left to the appropriate tool and protocols on the right. Not all tools and protocols are used. Answer: Explanation: ← Previous question Next question →