CheckPoint Exam Questions

Which of the following actions should be taken before deploying VPN-1/FireWall-1 in a production rol

Which of the following actions should be taken before deploying VPN-1/FireWall-1 in a production
role? (Choose three)

A.
Edit the ARP table for NAT.

B.
Disable all network services.

C.
Install and patch operating system(s).

D.
Obtain licenses.

E.
Configure routing.