PrepAway - Latest Free Exam Questions & Answers

Which two statements describe how to enable the final configuration?

You need to implement FC routing in your Gen 5 fabric. The backbone fabric will contain a
factory default Brocade 7800 Extension Switch and a Brocade DCX 8510-8 with two FC16-
32 blades. VEX_Port connectivity to the edge fabrics will be needed in the final
configuration. Which two statements describe how to enable the final configuration? (Choose
two.)

PrepAway - Latest Free Exam Questions & Answers

A.
An Integrated Routing license must be installed on the Brocade 7800 Extension Switch.

B.
LSAN zones must be configured in the backbone.

C.
VEX_Ports must be configured on the Brocade DCX 8510-8.

D.
VEX_Ports must be configured on the Brocade 7800 Extension Switch.

One Comment on “Which two statements describe how to enable the final configuration?


Leave a Reply