You need to deploy several FCoE initiators to communicate to FC targets. Which two
statements are true about deploying the solution? (Choose two.)
A.
Use the Brocade VDX 6730 switch and connect the FC target to the FC ports.
B.
Install an Integrated Routing license on the FC SAN switch.
C.
Install an Integrated Routing license on a Brocade VDX 6730 switch.
D.
Install an FCoE license.