You need to deploy several FCoE initiators to communicate to existing FC SAN attached
targets. Which two statements are true about deploying the solution? (Choose two.)

A.
Use a Brocade VDX 6730 switch.
B.
Install an Integrated Routing license on the FC SAN switch.
C.
Install an Integrated Routing license on a VDX 6730 switch.
D.
Configure LSAN zones.