Brocade Exam Questions

which two statements are true?

When configuring Flow Generator, which two statements are true? (Choose two.)

A.
SIM-Ports can be configured on 8 Gbps and 16 Gbps platforms.

B.
SIM-Ports must be configured on a Gen 5 FC port.

C.
The source port for the flow can be on 8 Gbps and 16 Gbps platforms.

D.
The source port for the flow must be a Gen 5 port.