PrepAway - Latest Free Exam Questions & Answers

Which statement is correct about using the Guided Maintenance (GM) scripts on an HP 3PAR StoreServ system?

Which statement is correct about using the Guided Maintenance (GM) scripts on an HP 3PAR
StoreServ system?

PrepAway - Latest Free Exam Questions & Answers

A.
The GM scripts have to be run on a 3PARsvc to replace the drive chassis midplane

B.
The Service Processor and node clock battery cannot be removed and replaced by using the
GM scripts.

C.
The GM scripts have to be run on a 3PARsvc to replace the Service Processor.

D.
The Controller Node and drive cage cannot be removed and replaced by using the GM scripts.

Explanation:


Leave a Reply