PrepAway - Latest Free Exam Questions & Answers

Which design impact must be considered if the Virtual Connect Flex-10 modules are not reinstalled in their ori

A customer is planning to move four HP BladeSystem c7000s to another location. The Onboard
Administrator firmware is at the current version. The disk drives and Virtual Connect Flex-10
modules must be removed before shipment.
Which design impact must be considered if the Virtual Connect Flex-10 modules are not
reinstalled in their original locations?

PrepAway - Latest Free Exam Questions & Answers

A.
The Virtual Connect configurations on the installed chassis will be overwritten.

B.
The blade chassis will be reset to factory defaults.

C.
The original Virtual Connect configurations will remain intact.

D.
All server network and SAN connections will be disabled.

Explanation:
http://h20565.www2.hp.com/portal/site/hpsc/template.BINARYPORTLET/public/kb/docDisplay/res
ource.process/?spf_p.tpst=kbDocDisplay_ws_BI&spf_p.rid_kbDocDisplay=docDisplayResURL&ja
vax.portlet.begCacheTok=com.vignette.cachetoken&spf_p.rst_kbDocDisplay=wsrpresourceState%3DdocId%253Demr_na-c03801914-
2%257CdocLocale%253D&javax.portlet.endCacheTok=com.vignette.cachetoken
Connecting multiple enclosures
Virtual Connect supports the connection of up to four c7000 enclosures, which can reduce the
number of network connections per rack and also enables a single VC Manager to control multiple
enclosures. A single set of cables can be used to carry all external Ethernet traffic from a single
rack.
Multiple enclosure support enables up to four c7000 enclosures to be managed within a single
Virtual Connect domain.