An HP VC Flex-10 module must be replaced in a c3000 BladeSystem enclosure because one
uplink port is defective. What must you do before physically replacing the module?

A.
Back up the enclosure EBIPA information.
B.
Copy the VCM logs to a flash drive.
C.
Back up the Virtual Connect settings
D.
Copy the server profiles to a flash drive
Explanation: