Refer to the exhibit.
A network administrator wants to create a leaf and spine topology. How should the administrator connect theswitches for the best latency and load-balancing?

A.
Connect each leaf switch to each spine switch, and run a protocol such as EVI.
B.
Connect each leaf switch to half of the spine switches, and run a protocol such as TRILL.
C.
Connect each leaf switch to each spine switch, and run a protocol such as TRILL.
D.
Connect each leaf switch to half of the spine switches, and run a protocol such as EVI.