PrepAway - Latest Free Exam Questions & Answers

Category: HP0-Y49

Exam HP0-Y49: HP ATP FlexNetwork Solutions

Which action should the network administrator perform to solve this problem?

Refer to the exhibit.
Exhibit: HP Comware Switch dir command output

A network administrator is upgrading the operating system on an HP Comware switch. When
copying the new image from a TFTP server to flash of the switch, the process fails because there
is not enough flash to store the new operating system. The new operating system is 3.2MB in size.
The network administrator then executes the commands shown in the exhibit.
Which action should the network administrator perform to solve this problem?

Which command must the network administrator execute to back up the current configuration of the switch?

A network administrator has just completed the initial configuration of an HP Comware switch. The
network administrator saved the configuration to flash but wants to ensure that is backed up
remotely to a TFTP server in case the switch fails. The TFTP server has an IP address of
10.1.100.1.
Which command must the network administrator execute to back up the current configuration of
the switch?


Page 4 of 7« First...23456...Last »