you need to consider?
You are implementing a CloudSystem Matrix environment. There is only one control management
server (CMS) on which you need install HP Command View P6000 and HP Matrix OE.
Which type of port conflicts you need to consider?
How can the customer perform an automated failover to the secondary site and keep all servers online?
A customer has two CloudSystem Matrix environments populated with ProLiant Bl460c Gen8
servers blades:
The primary site hasblades with VMwareESXi installedand sevenserver bladeswith
MicrosoftWindows Server 2008R2 installed
The secondarysite has sixserver blades with VMwareESXiinstalled and fourunassigned server
blades
How can the customer perform an automated failover to the secondary site and keep all servers
online?
Which HP product will enable the customer to fail over one production site to the other in the event of a site
A customer is implementing a CloudSystem Matrix at each of two active production sites.
Which HP product will enable the customer to fail over one production site to the other in the event
of a site failure?
Match each SPM communication component with the correct storage device.
Which value is required to make the network available for deployment to an Infrastructure Orchestration servic
You are configuring a network in an Infrastructure Orchestration administrator console. Which
value is required to make the network available for deployment to an Infrastructure Orchestration
service?
How can you obtain an Insight management Advisor report without errors?
You are deploying Matrix Operating Environment without Insight Control server deployment.
How can you obtain an Insight management Advisor report without errors?
what happens to a service when the lease expires?
In default CloudSystem Matrix implementation, what happens to a service when the lease
expires?
What should you do next?
You are reviewing an Insight management Advisor report that lists several errors. You resolve all
the issues in the report. What should you do next?
What will happen with the request?
You are configuring a physical server group in an Infrastructure Orchestration template. You enter
a memory size of 32 GB. When the template is requested, the only available servers have 64 GB
of memory.
What will happen with the request?
What must you do first?
You need to use a template from SCVMM to the Hyper-V server and then use the HP SIM virtual
Machine Manager (SCVMM) to deploy a virtual machine from infrastructure Orchestration.
What must you do first?