PrepAway - Latest Free Exam Questions & Answers

Author: seenagape

Which three things can be done to allow more virtual machines to be deployed into the cluster from this templa

ACME Junkmail Incorporated has been utilizing templates in their environment. They are
running a 10-node ESXi 5.x Cluster and DRS has not been configured. Several virtual
machines have been deployed from this template and successfully powered on, but a newly
deployed virtual machine will not power on. There appear to be adequate CPU and Memory
resources available on the host. Which three things can be done to allow more virtual
machines to be deployed into the cluster from this template? (Choose three.)

Which two statements are true about this configuration?

An administrator has been tasked with upgrading an existing host from ESX 4.1 to ESXi 5.x.
The existing host has only vSwitch0 with all the default settings. The upgraded host will
have the following new requirements. 116 virtual machines will be connected. Four uplinks
configured for port-based load balancing. The switch will include a secondary heartbeat
network for H A. Which two statements are true about this configuration? (Choose two.)


Page 349 of 1,200« First...102030...347348349350351...360370380...Last »