Which two actions should you perform?

###BeginCaseStudy###
Topic 5, Contoso Ltd Case B
Background
Overview
Contoso, Ltd., is a software development company. The company has a main office in Seattle and branch
offices that are located in Los Angeles and New Delhi. Contoso’s sales staff are all located in the Los
Angeles office. Contoso’s software developers are all located in the New Delhi office.Current Environment
The network for the Seattle office contains:
 2 domain controllers with integrated DNS
 200 Windows workstations
 14-node Hyper-V cluster
 1 file server with multiple shares
 1 Active Directory Rights Management Services (AD RMS) cluster
The network for the Los Angeles office contains:
 2 domain controllers with integrated DNS
 100 Windows workstations
 1 file server with multiple shares
The network for the New Delhi office contains:
 2 domain controllers with integrated DNS
 300 Windows workstations
 10 Hyper-V servers that host 100 development virtual machines (VMs)
 50 production virtual machines that are hosted in Azure
All the Contoso offices connect to each other by using VPN links, and each office is connected to the
Internet.
Contoso has a single Active Directory Domain Services (AD DS) domain named contoso.com.
Contoso.com has a configured certification authority (CA). Contoso currently leverages System Center
Virtual Machine Manager 2012 R2 to manage its virtual environment servers.
Contoso uses an application named HRApp1 for its human resources (HR) department. HR users report
that the application stops responding and must be restarted before they can continue their work.
Fabrikam, Inc.
Contoso has recently acquired Fabrikam, Inc. Fabrikam has a single office that is located in Seattle.
Fabrikam has a single AD DS domain named fabrikam.com.
The network for Fabrikam contains:
 2 domain controllers with Active Directory-integrated DNS
 150 Windows workstations
 5 Hyper-V servers
 1 file server with multiple shares
A two-way trust exists between Contoso.com and Fabrikam.com.
Business RequirementsConsolidation
Contoso must complete the consolidation of the Contoso and Fabrikam networks. The consolidation of
the two networks must:
 Minimize all hardware and software costs.
 Minimize WAN traffic.
 Enable the users by providing self-service whenever possible.
Security
Contoso requires that all Windows client devices must be encrypted with BitLocker by using the Trusted
Platform.
The CA for the domain contoso.com must be designated as the resource forest. The domain
fabrikam.com must leverage certificates that are issued by the domain contoso.com.
Other Information
HRApp1
 Each time HRApp1 stops responding and is restarted, an incident must be created and
associated with the existing problem ticket.
Development environment
You have the following requirements:
 Developers must be able to manage their own VM checkpoints.
 You must implement a disaster recovery strategy for development virtual machines.
Technical Requirements
Windows System Updates
You have the following system update requirements:
 Consolidate reporting of all software updates in all offices.
 Software updates must be applied to all Windows devices.
 Ensure the ability to report on update compliance.
Monitoring
You have the following monitoring requirements:
 Each time HRApp1 shows performance problems, ensure that a ticket is created.
 When performance problems are resolved, ensure that the ticket closes automatically.
Security
You have the following security requirements:
 Ensure that all documents are protected. Ensure that contoso.com domain users get use licenses for RMS-protected documents from the
domain contoso.com.
 Ensure that fabrikam.com domain users get use licenses for RMS-protected documents from
the domain contoso.com.

###EndCaseStudy###

You need to design a solution that meets all of the software update requirements.
Which two actions should you perform? Each correct answer presents part of the solution.

You need to configure Active Directory Rights Management Services (AD RMS)

###BeginCaseStudy###
Topic 5, Contoso Ltd Case B
Background
Overview
Contoso, Ltd., is a software development company. The company has a main office in Seattle and branch
offices that are located in Los Angeles and New Delhi. Contoso’s sales staff are all located in the Los
Angeles office. Contoso’s software developers are all located in the New Delhi office.Current Environment
The network for the Seattle office contains:
 2 domain controllers with integrated DNS
 200 Windows workstations
 14-node Hyper-V cluster
 1 file server with multiple shares
 1 Active Directory Rights Management Services (AD RMS) cluster
The network for the Los Angeles office contains:
 2 domain controllers with integrated DNS
 100 Windows workstations
 1 file server with multiple shares
The network for the New Delhi office contains:
 2 domain controllers with integrated DNS
 300 Windows workstations
 10 Hyper-V servers that host 100 development virtual machines (VMs)
 50 production virtual machines that are hosted in Azure
All the Contoso offices connect to each other by using VPN links, and each office is connected to the
Internet.
Contoso has a single Active Directory Domain Services (AD DS) domain named contoso.com.
Contoso.com has a configured certification authority (CA). Contoso currently leverages System Center
Virtual Machine Manager 2012 R2 to manage its virtual environment servers.
Contoso uses an application named HRApp1 for its human resources (HR) department. HR users report
that the application stops responding and must be restarted before they can continue their work.
Fabrikam, Inc.
Contoso has recently acquired Fabrikam, Inc. Fabrikam has a single office that is located in Seattle.
Fabrikam has a single AD DS domain named fabrikam.com.
The network for Fabrikam contains:
 2 domain controllers with Active Directory-integrated DNS
 150 Windows workstations
 5 Hyper-V servers
 1 file server with multiple shares
A two-way trust exists between Contoso.com and Fabrikam.com.
Business RequirementsConsolidation
Contoso must complete the consolidation of the Contoso and Fabrikam networks. The consolidation of
the two networks must:
 Minimize all hardware and software costs.
 Minimize WAN traffic.
 Enable the users by providing self-service whenever possible.
Security
Contoso requires that all Windows client devices must be encrypted with BitLocker by using the Trusted
Platform.
The CA for the domain contoso.com must be designated as the resource forest. The domain
fabrikam.com must leverage certificates that are issued by the domain contoso.com.
Other Information
HRApp1
 Each time HRApp1 stops responding and is restarted, an incident must be created and
associated with the existing problem ticket.
Development environment
You have the following requirements:
 Developers must be able to manage their own VM checkpoints.
 You must implement a disaster recovery strategy for development virtual machines.
Technical Requirements
Windows System Updates
You have the following system update requirements:
 Consolidate reporting of all software updates in all offices.
 Software updates must be applied to all Windows devices.
 Ensure the ability to report on update compliance.
Monitoring
You have the following monitoring requirements:
 Each time HRApp1 shows performance problems, ensure that a ticket is created.
 When performance problems are resolved, ensure that the ticket closes automatically.
Security
You have the following security requirements:
 Ensure that all documents are protected. Ensure that contoso.com domain users get use licenses for RMS-protected documents from the
domain contoso.com.
 Ensure that fabrikam.com domain users get use licenses for RMS-protected documents from
the domain contoso.com.

###EndCaseStudy###

DRAG DROP
You need to configure Active Directory Rights Management Services (AD RMS).
What should you do? To answer, drag the appropriate domain or option to the correct location.
Each domain or option may be used once, more than once, or not at all. You may need to drag the split
bar between panes or scroll to view content.

You need to design a solution that meets the monitoring requirements

###BeginCaseStudy###
Topic 5, Contoso Ltd Case B
Background
Overview
Contoso, Ltd., is a software development company. The company has a main office in Seattle and branch
offices that are located in Los Angeles and New Delhi. Contoso’s sales staff are all located in the Los
Angeles office. Contoso’s software developers are all located in the New Delhi office.Current Environment
The network for the Seattle office contains:
 2 domain controllers with integrated DNS
 200 Windows workstations
 14-node Hyper-V cluster
 1 file server with multiple shares
 1 Active Directory Rights Management Services (AD RMS) cluster
The network for the Los Angeles office contains:
 2 domain controllers with integrated DNS
 100 Windows workstations
 1 file server with multiple shares
The network for the New Delhi office contains:
 2 domain controllers with integrated DNS
 300 Windows workstations
 10 Hyper-V servers that host 100 development virtual machines (VMs)
 50 production virtual machines that are hosted in Azure
All the Contoso offices connect to each other by using VPN links, and each office is connected to the
Internet.
Contoso has a single Active Directory Domain Services (AD DS) domain named contoso.com.
Contoso.com has a configured certification authority (CA). Contoso currently leverages System Center
Virtual Machine Manager 2012 R2 to manage its virtual environment servers.
Contoso uses an application named HRApp1 for its human resources (HR) department. HR users report
that the application stops responding and must be restarted before they can continue their work.
Fabrikam, Inc.
Contoso has recently acquired Fabrikam, Inc. Fabrikam has a single office that is located in Seattle.
Fabrikam has a single AD DS domain named fabrikam.com.
The network for Fabrikam contains:
 2 domain controllers with Active Directory-integrated DNS
 150 Windows workstations
 5 Hyper-V servers
 1 file server with multiple shares
A two-way trust exists between Contoso.com and Fabrikam.com.
Business RequirementsConsolidation
Contoso must complete the consolidation of the Contoso and Fabrikam networks. The consolidation of
the two networks must:
 Minimize all hardware and software costs.
 Minimize WAN traffic.
 Enable the users by providing self-service whenever possible.
Security
Contoso requires that all Windows client devices must be encrypted with BitLocker by using the Trusted
Platform.
The CA for the domain contoso.com must be designated as the resource forest. The domain
fabrikam.com must leverage certificates that are issued by the domain contoso.com.
Other Information
HRApp1
 Each time HRApp1 stops responding and is restarted, an incident must be created and
associated with the existing problem ticket.
Development environment
You have the following requirements:
 Developers must be able to manage their own VM checkpoints.
 You must implement a disaster recovery strategy for development virtual machines.
Technical Requirements
Windows System Updates
You have the following system update requirements:
 Consolidate reporting of all software updates in all offices.
 Software updates must be applied to all Windows devices.
 Ensure the ability to report on update compliance.
Monitoring
You have the following monitoring requirements:
 Each time HRApp1 shows performance problems, ensure that a ticket is created.
 When performance problems are resolved, ensure that the ticket closes automatically.
Security
You have the following security requirements:
 Ensure that all documents are protected. Ensure that contoso.com domain users get use licenses for RMS-protected documents from the
domain contoso.com.
 Ensure that fabrikam.com domain users get use licenses for RMS-protected documents from
the domain contoso.com.

###EndCaseStudy###

You need to design a solution that meets the monitoring requirements.
What should you do?

Which servers should you include in the scale-out file cluster?

###BeginCaseStudy###
Topic 6, Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office
contains two data centers. All of the data centers and sites for the company have network connectivity
to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named
Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and
SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
 CHI1-HVNODE1.contoso.com
 CHI1-HVNODE2.contoso.com
 CHI1-HVNODE3.contoso.com
 CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
 CHI2-HVNODEl.contoso.com
 CHI2-HVNODE2.contoso.com
 CHI2-HVNODE3.contoso.com
 CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
 CHI-SERVERl.contoso.com
 CHI-SERVER2.contoso.com CHI-SERVER3.contoso.com
 CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in
the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is
located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQLSERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
 SEA3-HVNODEl.contoso.com
 SEA3-HVNODE2.contoso.com
 SEA3-HVNODE3.contoso.com
 SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
 SEA4-HVNODEl.contoso.com
 SEA4-HVNODE2.contoso.com
 SEA4-HVNODE3.contoso.com
 SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
 SEA-SERVERl.contoso.com
 SEA-SERVER2.contoso.com
 SEA-SERVER3.contoso.com
 SEA-SERVER4.contoso.comAll servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the
Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The
infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a
single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
 maximize data protection
 withstand the loss of a single guest virtual machine
 withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has
the following requirements:
 It must span multiple sites.
 It must support dynamic quorums.
 It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL
Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment
team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following
requirements:
 New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
 All other new VM guests must be deployed to any available server in the cluster.
New VDEThe company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It
has the following requirements:
 The file share cluster must withstand the loss of a single server.
 The file share cluster must withstand the loss of a single network path.
 The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL
Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
 The cluster must use a shared virtual hard disk.
 The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQLNODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file
share cluster must have a highly available storage solution for a Hyper-V environment. It has the
following requirements:
 The new file share cluster must support guest VM clusters.
 The storage cannot reside on any of the physical Hyper-V hosts.

###EndCaseStudy###

You need to implement a new highly available storage solution for the Hyper-V environment. Which
servers should you include in the scale-out file cluster?

Which three actions should you perform in sequence?

###BeginCaseStudy###
Topic 6, Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office
contains two data centers. All of the data centers and sites for the company have network connectivity
to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named
Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and
SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
 CHI1-HVNODE1.contoso.com
 CHI1-HVNODE2.contoso.com
 CHI1-HVNODE3.contoso.com
 CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
 CHI2-HVNODEl.contoso.com
 CHI2-HVNODE2.contoso.com
 CHI2-HVNODE3.contoso.com
 CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
 CHI-SERVERl.contoso.com
 CHI-SERVER2.contoso.com CHI-SERVER3.contoso.com
 CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in
the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is
located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQLSERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
 SEA3-HVNODEl.contoso.com
 SEA3-HVNODE2.contoso.com
 SEA3-HVNODE3.contoso.com
 SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
 SEA4-HVNODEl.contoso.com
 SEA4-HVNODE2.contoso.com
 SEA4-HVNODE3.contoso.com
 SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
 SEA-SERVERl.contoso.com
 SEA-SERVER2.contoso.com
 SEA-SERVER3.contoso.com
 SEA-SERVER4.contoso.comAll servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the
Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The
infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a
single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
 maximize data protection
 withstand the loss of a single guest virtual machine
 withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has
the following requirements:
 It must span multiple sites.
 It must support dynamic quorums.
 It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL
Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment
team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following
requirements:
 New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
 All other new VM guests must be deployed to any available server in the cluster.
New VDEThe company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It
has the following requirements:
 The file share cluster must withstand the loss of a single server.
 The file share cluster must withstand the loss of a single network path.
 The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL
Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
 The cluster must use a shared virtual hard disk.
 The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQLNODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file
share cluster must have a highly available storage solution for a Hyper-V environment. It has the
following requirements:
 The new file share cluster must support guest VM clusters.
 The storage cannot reside on any of the physical Hyper-V hosts.

###EndCaseStudy###

DRAG DROP
You need to implement VM-SQLclusterl.contoso.com.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the
list of actions to the answer area and arrange them in the correct order.

How should you complete the relevant Windows PowerShell command?

###BeginCaseStudy###
Topic 6, Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office
contains two data centers. All of the data centers and sites for the company have network connectivity
to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named
Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and
SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
 CHI1-HVNODE1.contoso.com
 CHI1-HVNODE2.contoso.com
 CHI1-HVNODE3.contoso.com
 CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
 CHI2-HVNODEl.contoso.com
 CHI2-HVNODE2.contoso.com
 CHI2-HVNODE3.contoso.com
 CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
 CHI-SERVERl.contoso.com
 CHI-SERVER2.contoso.com CHI-SERVER3.contoso.com
 CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in
the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is
located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQLSERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
 SEA3-HVNODEl.contoso.com
 SEA3-HVNODE2.contoso.com
 SEA3-HVNODE3.contoso.com
 SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
 SEA4-HVNODEl.contoso.com
 SEA4-HVNODE2.contoso.com
 SEA4-HVNODE3.contoso.com
 SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
 SEA-SERVERl.contoso.com
 SEA-SERVER2.contoso.com
 SEA-SERVER3.contoso.com
 SEA-SERVER4.contoso.comAll servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the
Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The
infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a
single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
 maximize data protection
 withstand the loss of a single guest virtual machine
 withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has
the following requirements:
 It must span multiple sites.
 It must support dynamic quorums.
 It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL
Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment
team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following
requirements:
 New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
 All other new VM guests must be deployed to any available server in the cluster.
New VDEThe company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It
has the following requirements:
 The file share cluster must withstand the loss of a single server.
 The file share cluster must withstand the loss of a single network path.
 The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL
Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
 The cluster must use a shared virtual hard disk.
 The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQLNODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file
share cluster must have a highly available storage solution for a Hyper-V environment. It has the
following requirements:
 The new file share cluster must support guest VM clusters.
 The storage cannot reside on any of the physical Hyper-V hosts.

###EndCaseStudy###

HOTSPOT
You need to deploy the new SQL cluster for App2.
How should you complete the relevant Windows PowerShell command? To answer, select the
appropriate Windows PowerShell segment from each list in the answer area.

How should you configure the implementation?

###BeginCaseStudy###
Topic 6, Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office
contains two data centers. All of the data centers and sites for the company have network connectivity
to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named
Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and
SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
 CHI1-HVNODE1.contoso.com
 CHI1-HVNODE2.contoso.com
 CHI1-HVNODE3.contoso.com
 CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
 CHI2-HVNODEl.contoso.com
 CHI2-HVNODE2.contoso.com
 CHI2-HVNODE3.contoso.com
 CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
 CHI-SERVERl.contoso.com
 CHI-SERVER2.contoso.com CHI-SERVER3.contoso.com
 CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in
the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is
located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQLSERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
 SEA3-HVNODEl.contoso.com
 SEA3-HVNODE2.contoso.com
 SEA3-HVNODE3.contoso.com
 SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
 SEA4-HVNODEl.contoso.com
 SEA4-HVNODE2.contoso.com
 SEA4-HVNODE3.contoso.com
 SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
 SEA-SERVERl.contoso.com
 SEA-SERVER2.contoso.com
 SEA-SERVER3.contoso.com
 SEA-SERVER4.contoso.comAll servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the
Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The
infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a
single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
 maximize data protection
 withstand the loss of a single guest virtual machine
 withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has
the following requirements:
 It must span multiple sites.
 It must support dynamic quorums.
 It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL
Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment
team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following
requirements:
 New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
 All other new VM guests must be deployed to any available server in the cluster.
New VDEThe company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It
has the following requirements:
 The file share cluster must withstand the loss of a single server.
 The file share cluster must withstand the loss of a single network path.
 The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL
Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
 The cluster must use a shared virtual hard disk.
 The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQLNODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file
share cluster must have a highly available storage solution for a Hyper-V environment. It has the
following requirements:
 The new file share cluster must support guest VM clusters.
 The storage cannot reside on any of the physical Hyper-V hosts.

###EndCaseStudy###

HOTSPOT
You need to implement the file share for the new virtual desktop environment.
How should you configure the implementation? To answer, select the appropriate option from each list
in the answer area.

How should you configure the locations?

###BeginCaseStudy###
Topic 6, Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office
contains two data centers. All of the data centers and sites for the company have network connectivity
to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named
Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and
SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
 CHI1-HVNODE1.contoso.com
 CHI1-HVNODE2.contoso.com
 CHI1-HVNODE3.contoso.com
 CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
 CHI2-HVNODEl.contoso.com
 CHI2-HVNODE2.contoso.com
 CHI2-HVNODE3.contoso.com
 CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
 CHI-SERVERl.contoso.com
 CHI-SERVER2.contoso.com CHI-SERVER3.contoso.com
 CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in
the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is
located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQLSERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
 SEA3-HVNODEl.contoso.com
 SEA3-HVNODE2.contoso.com
 SEA3-HVNODE3.contoso.com
 SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
 SEA4-HVNODEl.contoso.com
 SEA4-HVNODE2.contoso.com
 SEA4-HVNODE3.contoso.com
 SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
 SEA-SERVERl.contoso.com
 SEA-SERVER2.contoso.com
 SEA-SERVER3.contoso.com
 SEA-SERVER4.contoso.comAll servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the
Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The
infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a
single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
 maximize data protection
 withstand the loss of a single guest virtual machine
 withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has
the following requirements:
 It must span multiple sites.
 It must support dynamic quorums.
 It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL
Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment
team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following
requirements:
 New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
 All other new VM guests must be deployed to any available server in the cluster.
New VDEThe company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It
has the following requirements:
 The file share cluster must withstand the loss of a single server.
 The file share cluster must withstand the loss of a single network path.
 The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL
Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
 The cluster must use a shared virtual hard disk.
 The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQLNODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file
share cluster must have a highly available storage solution for a Hyper-V environment. It has the
following requirements:
 The new file share cluster must support guest VM clusters.
 The storage cannot reside on any of the physical Hyper-V hosts.

###EndCaseStudy###

HOTSPOT
You need to implement App1.
How should you configure the locations? To answer, select the appropriate option from each list in the
answer area.

You need to enable virtual machine network health detection on all supported clusters

###BeginCaseStudy###
Topic 6, Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office
contains two data centers. All of the data centers and sites for the company have network connectivity
to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named
Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and
SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
 CHI1-HVNODE1.contoso.com
 CHI1-HVNODE2.contoso.com
 CHI1-HVNODE3.contoso.com
 CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
 CHI2-HVNODEl.contoso.com
 CHI2-HVNODE2.contoso.com
 CHI2-HVNODE3.contoso.com
 CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
 CHI-SERVERl.contoso.com
 CHI-SERVER2.contoso.com CHI-SERVER3.contoso.com
 CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in
the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is
located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQLSERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
 SEA3-HVNODEl.contoso.com
 SEA3-HVNODE2.contoso.com
 SEA3-HVNODE3.contoso.com
 SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
 SEA4-HVNODEl.contoso.com
 SEA4-HVNODE2.contoso.com
 SEA4-HVNODE3.contoso.com
 SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
 SEA-SERVERl.contoso.com
 SEA-SERVER2.contoso.com
 SEA-SERVER3.contoso.com
 SEA-SERVER4.contoso.comAll servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the
Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The
infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a
single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
 maximize data protection
 withstand the loss of a single guest virtual machine
 withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has
the following requirements:
 It must span multiple sites.
 It must support dynamic quorums.
 It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL
Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment
team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following
requirements:
 New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
 All other new VM guests must be deployed to any available server in the cluster.
New VDEThe company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It
has the following requirements:
 The file share cluster must withstand the loss of a single server.
 The file share cluster must withstand the loss of a single network path.
 The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL
Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
 The cluster must use a shared virtual hard disk.
 The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQLNODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file
share cluster must have a highly available storage solution for a Hyper-V environment. It has the
following requirements:
 The new file share cluster must support guest VM clusters.
 The storage cannot reside on any of the physical Hyper-V hosts.

###EndCaseStudy###

You need to enable virtual machine network health detection on all supported clusters.
What should you do?

Use the drop-down menus to select the answer choice that answers each question based on …

###BeginCaseStudy###
Topic 6, Contoso Ltd Case C
Background
Overview
Contoso, Ltd., is a manufacturing company. The company has offices in Chicago and Seattle. Each office
contains two data centers. All of the data centers and sites for the company have network connectivity
to each other. The company uses a single Active Directory Domain Services (AD DS) domain.
Contoso is growing rapidly and needs to expand its computer infrastructure.
Current Environment Chicago Office
The Chicago office contains a primary data center and a backup data center. A Hyper-V cluster named
Clusterl.contoso.com resides in the primary data center. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines (VMs) named SQL-SERVER1 and
SQL-SERVER2. The cluster also includes a Hyper-V Host group named Chi-Primary.
Clusterl.contoso.com contains the following servers:
 CHI1-HVNODE1.contoso.com
 CHI1-HVNODE2.contoso.com
 CHI1-HVNODE3.contoso.com
 CHI1-HVNODE4.contoso.com
The backup data center for the Chicago office is located on a Hyper-V cluster named
Cluster2.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Chi-Backup.
Cluster2.contoso.com contains the following servers:
 CHI2-HVNODEl.contoso.com
 CHI2-HVNODE2.contoso.com
 CHI2-HVNODE3.contoso.com
 CHI2-HVNODE4.contoso.com
In addition, the Chicago office contains two standalone Hyper-V servers named CHIHVSERVER1.contoso.com and CHI-HVSERVER2.contoso.com.
There are also four newly built servers:
 CHI-SERVERl.contoso.com
 CHI-SERVER2.contoso.com CHI-SERVER3.contoso.com
 CHI-SERVER4.contoso.com
All the servers in the Chicago office run Windows Server 2012. Any future servers that are deployed in
the Chicago office must also run Windows Server 2012.
All servers in the Chicago office use the subnet 10.20.xx.
Current Environment Seattle Office
The Seattle office contains a primary data center and a backup data center. The primary data center is
located on a Hyper-V cluster named Cluster3.contoso.com. The cluster has a multiple network path
configured. The cluster includes two unused SQL Server virtual machines named SQL-SERVER3 and SQLSERVERS. The cluster includes a Hyper-V Host group named Sea-Primary.
Cluster3.contoso.com contains the following servers:
 SEA3-HVNODEl.contoso.com
 SEA3-HVNODE2.contoso.com
 SEA3-HVNODE3.contoso.com
 SEA3-HVNODE4.contoso.com
The backup data center for the Seattle office is located on a Hyper-V cluster named
Cluster4.contoso.com. The cluster has a single network path configured. The cluster includes a Hyper-V
Host group named Sea-Backup.
Cluster4.contoso.com contains the following servers:
 SEA4-HVNODEl.contoso.com
 SEA4-HVNODE2.contoso.com
 SEA4-HVNODE3.contoso.com
 SEA4-HVNODE4.contoso.com
In addition, the Seattle office contains two standalone Hyper-V servers named SEAHVSERVERl.contoso.com and SEA-HVSERVER2.contoso.com.
There are also four newly built servers:
 SEA-SERVERl.contoso.com
 SEA-SERVER2.contoso.com
 SEA-SERVER3.contoso.com
 SEA-SERVER4.contoso.comAll servers in the Seattle office run Windows Server 2012 R2. Any future servers that are deployed in the
Seattle office must also run Windows Server 2012 R2.
All servers in the Seattle office use the subnet 10.10.x.x.
Business Requirements
Apps
Contoso plans to deploy new applications to make its departments more efficient.
App1
Contoso must create a new application named App1 for the human resources (HR) department. The
infrastructure for App1 must reside in a virtual environment and the data files for App1 must reside on a
single shared disk. In addition, the infrastructure for App1 must meet the following requirements:
 maximize data protection
 withstand the loss of a single guest virtual machine
 withstand the loss of a single physical server
To support App1, Contoso must deploy a new cluster named Applcluster.contoso.com. The cluster has
the following requirements:
 It must span multiple sites.
 It must support dynamic quorums.
 It must prevent failures caused by a 50% split.
App2
Contoso must create a new application named App2. To support App2, Contoso must deploy a new SQL
Server cluster. The cluster must not be part of the domain.
The server deployment team that will install the cluster has limited permissions. The server deployment
team does not have the ability to create objects in Active Directory.
Virtualization and Storage
New VMs
Any new VMs that are deployed to the Hyper-V cluster in Cluster3.contoso.com have the following
requirements:
 New SQL Server VMs must be deployed only to odd-numbered servers in the cluster.
 All other new VM guests must be deployed to any available server in the cluster.
New VDEThe company needs a highly available file share cluster for a new Virtual Desktop Environment (VDE). It
has the following requirements:
 The file share cluster must withstand the loss of a single server.
 The file share cluster must withstand the loss of a single network path.
 The file share cluster must use the least amount of disk space.
New virtualized SQL Server cluster
Contoso must create a new application for manufacturing. The company needs a new virtualized SQL
Server cluster named VM-SQLclusterl.contoso.com. It has the following requirements:
 The cluster must use a shared virtual hard disk.
 The cluster must have two nodes named VM-SQL-NODE1.contoso.com and VM-SQLNODE2.contoso.com.
Highly available storage solution
The company is deploying new hardware that will replace the existing Hyper-V clusters. The new file
share cluster must have a highly available storage solution for a Hyper-V environment. It has the
following requirements:
 The new file share cluster must support guest VM clusters.
 The storage cannot reside on any of the physical Hyper-V hosts.

###EndCaseStudy###

HOTSPOT
You plan to configure Windows Network Load Balancing (NLB) for a company. You display following
Network Load Balancing Manager window:

Use the drop-down menus to select the answer choice that answers each question based on the
information presented in the graphic.