Disaster Recovery Plan (DRP) training material should be
A.
consistent so that all audiences receive the same training.
B.
stored in a fire proof safe to ensure availability when needed.
C.
only delivered in paper format.
D.
presented in a professional looking manner.
The answer is not correct:
“As with a business continuity plan, it is essential that you provide training to all personnel
who will be involved in the disaster recovery effort. The level of training required will
vary according to an individual’s role in the effort and their position within the company.”
from ISC2 official study guide V7, p. 792