IBM Exam Questions

What is the minimum PowerHA solution that should be proposed?

Due to new regulatory requirements, a Power Systems customer must set up a disaster

recovery site in a geographical location at least 120 miles (194 km) away from the main site.
What is the minimum PowerHA solution that should be proposed?

A.
Express Edition

B.
Geographical Edition

C.
Standard Edition

D.
Enterprise Edition