Where should the light panel cables of the System Bay be connected?
A CE is currently installing a VMAX 40K. Where should the light panel cables of the System Bay
be connected?
How does the Service Processor communicate with all 8 engines in a VMAX 20K?
How does the Service Processor communicate with all 8 engines in a VMAX 20K?
What is the maximum number of Storage Bays that can be attached to a Symmetrix VMAX 10K (987)?
What is the maximum number of Storage Bays that can be attached to a Symmetrix VMAX 10K
(987)?
What is the maximum number of Storage Bays that can be attached to a Symmetrix VMAX 10K (959)?
What is the maximum number of Storage Bays that can be attached to a Symmetrix VMAX 10K
(959)?
Which two System Bays use the same component layout when fully populated?
Which two System Bays use the same component layout when fully populated?
How many Management Modules are installed in a 6 bay VMAX 10K (987)?
How many Management Modules are installed in a 6 bay VMAX 10K (987)?
What is the maximum DAE count for Engine 1 of a VMAX 10K (987) dense configuration?
What is the maximum DAE count for Engine 1 of a VMAX 10K (987) dense configuration?
what impact will it have on the VMAX 40K system?
When upgrading an existing I/O module to a DARE I/O module, what impact will it have on the
VMAX 40K system?
Which action needs to be taken if the Backend Cabling Verification fails after a Data Center relocation?
Which action needs to be taken if the Backend Cabling Verification fails after a Data Center
relocation?
Which service engagement would require PSE intervention prior to moving the cables?
While running the Backend Cabling Verification script, the LEDs do not match the SymmWin
graphic. It halts with a message that there is a cabling error and advises moving cables. Which
service engagement would require PSE intervention prior to moving the cables?