Cisco Exam Questions

What does this mean?

The output of the show frame-relay pvc command shows “PVC STATUS = INACTIVE”. What does this
mean?

A.
The PVC is configured correctly and is operating normally, but no data packets have been
detected for more than five minutes.

B.
The PVC is configured correctly, is operating normally, and is no longer actively seeking the
address of the remote router.

C.
The PVC is configured correctly, is operating normally, and is waiting for interesting traffic to
trigger a call to the remote router.

D.
The PVC is configured correctly on the local switch, but there is a problem on the remote end of
the PVC.

E.
The PVC is not configured on the local switch.