Which well-known address is responsible for notifying the remaining nodes in the fabric of the chang

You remove a switch from the fabric. Which well-known address is responsible for notifying
the remaining nodes in the fabric of the change in topology?

A.
Broadcast Server (FFFFFF)

B.
Management Server (FFFFFA)

C.
Name Server (FFFFFC)

D.
Fabric Controller (FFFFFD)

Explanation: