What should you do to improve the proposal TCO?

Refer to the exhibit:

You are presenting a converged infrastructure proposal to the director of IT and the infrastructure
administration team. The configuration is to refresh the infrastructure at a wholly-owned subsidiary
company.
They plan to have a SQL standby server in their main data center for recovery. The director
informs you that the subsidiary IT staff has been laid off and that the configuration needs to be as
easy to manage as possible because it will be done remotely.
What should you do to improve the proposal TCO?

Which HP Storage solution should you recommend?

A retail customer has primary data centers, distribution centers, and retail stores. The retail
locations are smaller sites that have less than 2 TB of data that need to be highly available. Each
location is consolidating between six and twelve physical servers into a virtual cluster running on
two HP ProLiant DL380 Gen8 servers.
The customer needs a low-cost storage solution that they can use at each retail location and can
scale using similar technology for the distribution centers. The solution also needs to integrate with
VMware and provide future replication with no additional cost.
Which HP Storage solution should you recommend?

Which mission critical backup solution and support level should you propose?

A large regional telecommunications company specializing in mobile services has experienced
rapid growth.
They currently have 149 million subscribers in 11 markets, including 4 million subscribers locally.
The year-onyear data growth between 2003 and 2012 was approximately 15%. The projected
growth far 2013 and the next several years is 30% annually.
The proposed mission critical solution needs to work with the existing application modules and
deliver a minimum data transfer rate of 6 5 TB per hour and a capacity of 120 TB. Financially, the
solution has to offer low Total Cost of Ownership (TCO) over the next 5 years, and solution
capacity has to accommodate the performance and growth model.
Which mission critical backup solution and support level should you propose? (Select two.)

Which HP 3PAR licenses should be included in the proposal?

You propose a solution to a VMware customer. The solution consists of two HP 3PAR StoreServ
Storage systems, one for each data center that the customer currently operates. The customer
requires that the solution be capable of making a transparent failover between the primary and
secondary data center even in the case of a complete data center failure.
Which HP 3PAR licenses should be included in the proposal? (Select two.)

Which tools should you use to accomplish this goal?

You need to gather data in order to size a new storage system for a customer that has an existing
HP StorageWorks Enterprise Virtual Array 5000. The customer wants as much data analyzed as
possible with the least amount of impact. Additionally, the customer wants to assess the
environment during month-end closing to gather the data.
Which tools should you use to accomplish this goal? (Select two.)

What should you propose to meet the customer requirements?

A customer has an outdated 4Gb Fibre Channel infrastructure environment that needs to be
updated. The customer uses two data centers on a campus with a dual-redundant fabric layout
interconnected by customer owned fiber and an evenly-spread port count. The total port count is
86 ports per fabric and is unlikely to increase due to the continuing virtualization of physical
servers. The customer is concerned about data security and requires the connections between
data centers to be encrypted.
What should you propose to meet the customer requirements?